North Berwick NB001 Hull Turned Over Wk7


North Berwick have turned over NB001, and have started cleaning up the inside of the hull ready for internal fit out.  They have fitted the hog for NB002 onto the recently vacated moulds.  No holding them back!
NB001 Hull Construction Complete 20 Feb 2010

NB001 Hull Construction Complete 20 Feb 2010

  1. #1 by chrispn on 25 February 2010 - 9:57 am

    Congratulations from the Ullapool A team, she will look grand once the inevitable dribbles are cleaned up. We hope to reach the same stage this coming weekend.

  2. #2 by robbiew on 26 February 2010 - 3:29 pm

    Thanks Chris. Hope you can post a pic on here at the turning over stage for Ullapool 1.

You must be logged in to post a comment.